project related to a book store in Queensland

Project Planning

1.      Executive Summary

  1. Introduction
  2. Discussion

3.1High Level Solution of the Project

3.2 Project Initiation

Don't use plagiarized sources. Get Your Custom Essay on
project related to a book store in Queensland
Just from $9/Page
Order Essay

3.3 Project Planning

3.4 Design

3.4.1Development and Testing

3.5 Project Resource Management

3.6 Project communication

3.7 Project cost

3.8 project communication

3.9 Project Risk Management

  1. Recommendations
  2. Conclusion
  3. References

Executive Summary

This project is spearheaded by Queensland Book Company. The project aims at providing an online ordering system for their customers. The project aims at adding new ordering methods to the existing ones.

The information technology of the solution has be designed to have a web application which will have java/ jsp web pages and will be connected to the world over the internet. This application will have a back end database where all the information will be stored. The web application will be linked to the database and will query and return the information as required.

 

The author is engaged to the project as a project manager and as part of the project management has performed various aspects of project management like Project planning, project, project execution, project monitoring and project closing.

 

In this project, schedule, cost and quality will be managed by three people. The project manager, his deputy and a senior staff will oversee the running of the project.  The project also follows a standard information technology methodology of Requirements capture, design, develop, test and deploy.

 

It can be said that when the project management tools and techniques are followed, the probability of the project achieving its objectives are more.

1.      Introduction

Projects are temporal activities that are done to provide goods and services to many people. They go through processes before they can get approved. It is important to do adequate research before any project to determine whether the project will be beneficial or wasteful (Crosall B 2011). It encompasses Setting objectives (these should be measurable), identifying deliverables, planning the schedule, making supporting plans (Rouse M 2007).

This project is related to a book store in Queensland, hence forth referred to as “the bookstore”. The Book store has launched a prestigious flagship project in which it would be starting internet-based operations in which a customer can order online from any part of the globe and his order would be processed by shipping the ordered book to the physical address.

Providing a softcopy of the books and providing the capability to download the ebook was also in scope of this project.

The project has engaged the author as a project manager to execute this project. As part of this project the high-level plan is to implement a data base which will store all the information about the book’s stock and inventory and a front end web application which will be available via internet to customers across the globe. Ebooks and shipping activity of hard covered books are treated as separate components which will be finally integrated to the newly developed information technology (IT) solution as part of this project.

It is to be noted that this report is based on pure speculation by the author and in no way may represent the actual solution for the bookstore. The idea of this report is to demonstrate the author’s knowledge in project management skills in managing a similar kind of project.

2.      Discussion

3.1 High Level Solution of the Project

The proposed solution to the Book store revolves around the implementation of a web application which will be hosted on a web server and will be connected to the world by the internet. This application will have a listing of the available books at the book store along with its description, some information about the author and its cost in local currency.

 

The order placing process is also simple and users are free to browse the website without any registration and view the availability of books in the catalog page, in case some title interests the user, he may navigate to any individual book page where details of the book and its author are available. When the user is ready to buy a book he can add the book to his cart and do a regular check out process in which he can opt for a softcopy of the book (ebook) or a bounded book which will be shipped to his address. Based on his selection, the logistics costs are added and on completion of the financial transaction of the user, the order is placed. The architecture of the proposed solution can be shown as :

(Egnyte 2013)

Project Management Activities of the solution

 

Based on the above general information on the project and the high level solution the following project management activities are carried out.

 

3.2 Project Initiation

As part of the project initiation activity the project charter and the statement of work was developed which will give the project manager an initial scope of the project and a go ahead to start work on the project.

 

Once the project Statement of work is signed, the project manager starts with the project planning phase in which the project work break down structure will be created and the project schedule created.

 

3.3 Project Planning

Project planning is an important phase of the project in which the blueprint of the project is created.

Project planning mainly consist of schedule planning, resource planning and cost planning.

During the planning phase of the project, the project solution is decomposed into smaller units of works called Work break structure (WBS) This activity helps to manage the project as it is easy to manage smaller bits than a large piece.

The project will be divided into the following high-level WBS (level 1)

  1. Requirement gathering
  2. Design
  3. Development and testing
  4. Ebooks component implementation
  5. Logistics component arrangement
  6. Go live activities.

 

 

Requirement Gathering: Requirement gathering is the activity in which the projects stake holders and business leads are interviewed. The basis of these interviews is to gather the business requirements for the project.

The business requirements can be consolidated in the following business requirements:

  1. Have an online portal which will display the inventory at the book store along with the book description, author description and price.
  2. A user will be able to select a book and add to cart.
  3. The user will be able to modify the cart easily (Add, modify, delete books)
  4. The financial transaction performed by the user will be executed in a secured manner.
  5. The user will be provided with the choice to purchase an ebook or a hard copy book.

 

3.4 Design

 

The design phase of the project is in which the conceptual and the low level design will be done, Design is the blueprint on basis of which the actual development takes place. A feasibility study will also be undertaken as part of the design. During the feasibility study phase, the feasibility of the solution is undertaken where the implementation of the project will studied. Only on completion of the feasibility phase the conceptual design and later phases are executed.

 

3.4.1 Development and Testing

 

Development phase of the project is when the actual project code is being built. For this project development has been divided into three streams:

  1. Back end stream: The solution of this project consists of a database design and development, in the back end stream the back end database model is prepared and based on the logical model a physical database is prepared. The main requirements for the data base come form the information which is to be stored for the operations of the business.
  2. Front end stream: The second major component of the solution is the front end in which is the view the world would see. This solution develops a web application hosted on a web server which will have various java pages (screens) and a defined navigation flow between pages which will ensure the user of the website has a good user experience navigating through the website. The front development stream deals with the development of these front end screens.
  3. Middle ware integration: The solution develops a middle ware which will integrate the back end and the front end. This is mainly in form of queries issues by the front end and executed by the back end.

 

The testing phase of the project will be divided into three cycles:

  1. Unit testing: in unit testing, individual testing of the components will be done as and during development of the system.
  2. System integration testing: in System integration testing, the complete system will tested in whole for its functionality. It is during this time performance and regression testing will done.
  3. User acceptance testing: this will be the final phase of the project when the user tests the application and certifies its fitness for use.

This high level WBS along with their sub-tasks have been plotted against the project plan generated in Microsoft Project 2010.  Based on the WBS and their detail the project schedule is created by allocating the duration. A snapshot of the Project schedule can be shown as. The above screen print shows certain tasks in Red colour, these are the tasks which are said to be on the critical path. Any change in the duration of the critical path changes the overall project schedule.

3.5Project Resource Management

 

Based on the project plan the following project resources have been identified and their main responsibility is as:

 

Resource Profile Main responsibility
   
Business Analyst Requirements gathering for new functionality
database analyst and Developer Back end design and Development
Web application analyst and Developer Front end design and Development
Test analyst Testing of application and assisting user to perform user acceptance testing
Project Manager Stake holder management and Project management

 

 

3.6 Project Costs

The project cost management deals with the project costs.

In this project the major cost involved is the resources cost which will be needed to executed the other costs like the hardware cost and logistics costs are not calculated in the project costing below.

The resource cost can be calculated from the project management tool and it can be summed to a total of: 157160$.

 

The cost Vs project progress measured by the time since the project started can be plotted as:

 

 

Cumulative (Days) Cost (cumulative)
5 $3,200.00
15 $9,600.00
25 $16,000.00
30 $22,600.00
40 $33,800.00
45 $39,400.00
60 $56,200.00
75 $64,600.00
90 $73,000.00
115 $73,000.00
140 $87,000.00
150 $92,600.00
160 $98,200.00
175 $106,600.00
182 $109,960.00
191 $120,040.00
203 $126,760.00
208 $129,560.00
212 $131,800.00
216 $134,040.00
223 $137,400.00
230 $140,760.00
235 $143,160.00
238 $144,600.00
248 $150,880.00
258 $156,480.00
259 $157,160.00

 

 

 

 

 

Please note the above numbers are obtained from the project management tool from the project plan.

 

 

The project schedule as obtained from the project plan can be showed in the Gantt chart. (Please refer to the project plan)

3.7 Project communication

 

Project communication management is an important aspect which determines the project success criteria. A project consists of various stakeholders who have varied interest levels in the project, it is very important to keep all the stake holders on the same page, this can be best achieved by proper communication. Not only stake holders the project team performs various functions which need to take inputs from other functions, hence it is important that the project team should in on the same page which is again achieved by a communication plan.

The project will have a communication plan which would have the following details:

  1. What communication is to be sent to stakeholders at what frequency
  2. frequency of status reports
  3. Maintenance of communication log where decisions are made.
  4. (Responsible, Accountable, Consulted and Informed)RACI identified for communication generator, distributor
  5. Publishing, distribution and storage of in general communication.

 

A sample status report should contain the following information and should be generated and published periodically.

 

 

Project Type

Start Date

End Date

Reporting Date

% Completion

Objective / Key Activities

Key accomplishments for reporting period

Upcoming  milestones / tasks for next reporting period

Risk/Issue

Action to Mitigate

Health indicator:

Overall Health:

 

3.9 Project Risk Management

As part of the project management activities, risk management was actively taken. The following activities were performed as part of risk management:

  1. Identification of potential risks to the project
  2. Identification of the characteristics of the risk
  3. Identification of the mitigation strategy for the risk

 

Based on the above risk management activities the following risk plan has been prepared for the company.

 

Risk # Risk Risk Description Risk Identification Risk Mitigation Risk probability Impact if occurred.
1 Failure to gather requirements in complete Business requirements not captured to the required level of detail. 1. changes in scope of the project or scope creep.
2. Requirements captured not enough to solve requirement
1. A requirements workshop will be conducted where all stake holders will be walk throughed to the captured requirements which will address any missing or misunderstood requirements. High High
2 Hardware compatibility Risks The current hardware of the company is not compatibility with the new solution 1. programs fail to install in the existing environment.
2. performance issues, slow response etc.
A feasibility study will be conducted to check the feasibility of the new software on the current hardware. Low High
3 Software compatibility risks The new software is not compatible with the hardware or does not integrate with the existing software. 1. programs fail to install in the existing environment.
2. migration of existing system is very difficult.
A feasibility study will be conducted to check the feasibility of the new software integration with the existing software. Low High
4 Solution not in line with requirements. The solution does not address all the requirements. all expected functionality not available. 1. A requirement traceability matrix will be generated where all the business requirements will be traced to the solution. In an event any requirement is not been able to be traced to the solution, it will be flagged as not addressed. High High

 

4.      Evaluation and analysis of the project

This project will be evaluated on a weekly basis. It will be evaluated to check whether it is in line with the plan. The secretary of the project will record all the progresses of the project. The reports will be submitted to the project manager on a weekly basis. It will be the role of the manager and his managerial staff to assess the project’s development.

  1. Recommendations

This project is technical and it requires several factors for it to be successful. I recommend that the project hires specialized IT specialists. These personnel’s will oversee the coding of the new pages. These members of staff should be passed through a thorough interview and a scrutiny of their experiences to ensure that they will deliver the project on time

6.      Conclusion

Based on the above discussion it can be concluded that any project no matter how complex the project problem statement may be, can be successfully completed by applying proper project management techniques (as long as the feasibility is successful)

Project management tool and techniques do not help the project to become successful, however they guide the project processes and task to be completed successfully.

 

7.      References

 

Crosall B 2011 [online] 12 Basic Principles of Project Management available at http://chronicle.com/blogs/profhacker/12-basic-principles-of-project-management/31421 (accessed on 06/10/2013)e.

 

Egnyte 2013 What are the differences between a file server and a client server? Available at http://www.egnyte.com/ask-an-expert/file-server-questions/what-are-the-differences-between-a-file-server-and-client-server.html ( accessed on 06/10/2013)

 

Project management journal 2004 A guide to the project management body of knowledge vol. 1 issue 2, pp. 35-70. print

 

Rouse M 2007 [online] Project planning available at   HYPERLINK “http://searchcrm.techtarget.com/definition/project-planning”  http://searchcrm.techtarget.com/definition/project-planning  (accessed on 06/10/2013).

 


Get Professional Assignment Help Cheaply

Buy Custom Essay

Are you busy and do not have time to handle your assignment? Are you scared that your paper will not make the grade? Do you have responsibilities that may hinder you from turning in your assignment on time? Are you tired and can barely handle your assignment? Are your grades inconsistent?

Whichever your reason is, it is valid! You can get professional academic help from our service at affordable rates. We have a team of professional academic writers who can handle all your assignments.

Why Choose Our Academic Writing Service?

  • Plagiarism free papers
  • Timely delivery
  • Any deadline
  • Skilled, Experienced Native English Writers
  • Subject-relevant academic writer
  • Adherence to paper instructions
  • Ability to tackle bulk assignments
  • Reasonable prices
  • 24/7 Customer Support
  • Get superb grades consistently
 

Online Academic Help With Different Subjects

Literature

Students barely have time to read. We got you! Have your literature essay or book review written without having the hassle of reading the book. You can get your literature paper custom-written for you by our literature specialists.

Finance

Do you struggle with finance? No need to torture yourself if finance is not your cup of tea. You can order your finance paper from our academic writing service and get 100% original work from competent finance experts.

Computer science

Computer science is a tough subject. Fortunately, our computer science experts are up to the match. No need to stress and have sleepless nights. Our academic writers will tackle all your computer science assignments and deliver them on time. Let us handle all your python, java, ruby, JavaScript, php , C+ assignments!

Psychology

While psychology may be an interesting subject, you may lack sufficient time to handle your assignments. Don’t despair; by using our academic writing service, you can be assured of perfect grades. Moreover, your grades will be consistent.

Engineering

Engineering is quite a demanding subject. Students face a lot of pressure and barely have enough time to do what they love to do. Our academic writing service got you covered! Our engineering specialists follow the paper instructions and ensure timely delivery of the paper.

Nursing

In the nursing course, you may have difficulties with literature reviews, annotated bibliographies, critical essays, and other assignments. Our nursing assignment writers will offer you professional nursing paper help at low prices.

Sociology

Truth be told, sociology papers can be quite exhausting. Our academic writing service relieves you of fatigue, pressure, and stress. You can relax and have peace of mind as our academic writers handle your sociology assignment.

Business

We take pride in having some of the best business writers in the industry. Our business writers have a lot of experience in the field. They are reliable, and you can be assured of a high-grade paper. They are able to handle business papers of any subject, length, deadline, and difficulty!

Statistics

We boast of having some of the most experienced statistics experts in the industry. Our statistics experts have diverse skills, expertise, and knowledge to handle any kind of assignment. They have access to all kinds of software to get your assignment done.

Law

Writing a law essay may prove to be an insurmountable obstacle, especially when you need to know the peculiarities of the legislative framework. Take advantage of our top-notch law specialists and get superb grades and 100% satisfaction.

What discipline/subjects do you deal in?

We have highlighted some of the most popular subjects we handle above. Those are just a tip of the iceberg. We deal in all academic disciplines since our writers are as diverse. They have been drawn from across all disciplines, and orders are assigned to those writers believed to be the best in the field. In a nutshell, there is no task we cannot handle; all you need to do is place your order with us. As long as your instructions are clear, just trust we shall deliver irrespective of the discipline.

Are your writers competent enough to handle my paper?

Our essay writers are graduates with bachelor's, masters, Ph.D., and doctorate degrees in various subjects. The minimum requirement to be an essay writer with our essay writing service is to have a college degree. All our academic writers have a minimum of two years of academic writing. We have a stringent recruitment process to ensure that we get only the most competent essay writers in the industry. We also ensure that the writers are handsomely compensated for their value. The majority of our writers are native English speakers. As such, the fluency of language and grammar is impeccable.

What if I don’t like the paper?

There is a very low likelihood that you won’t like the paper.

Reasons being:

  • When assigning your order, we match the paper’s discipline with the writer’s field/specialization. Since all our writers are graduates, we match the paper’s subject with the field the writer studied. For instance, if it’s a nursing paper, only a nursing graduate and writer will handle it. Furthermore, all our writers have academic writing experience and top-notch research skills.
  • We have a quality assurance that reviews the paper before it gets to you. As such, we ensure that you get a paper that meets the required standard and will most definitely make the grade.

In the event that you don’t like your paper:

  • The writer will revise the paper up to your pleasing. You have unlimited revisions. You simply need to highlight what specifically you don’t like about the paper, and the writer will make the amendments. The paper will be revised until you are satisfied. Revisions are free of charge
  • We will have a different writer write the paper from scratch.
  • Last resort, if the above does not work, we will refund your money.

Will the professor find out I didn’t write the paper myself?

Not at all. All papers are written from scratch. There is no way your tutor or instructor will realize that you did not write the paper yourself. In fact, we recommend using our assignment help services for consistent results.

What if the paper is plagiarized?

We check all papers for plagiarism before we submit them. We use powerful plagiarism checking software such as SafeAssign, LopesWrite, and Turnitin. We also upload the plagiarism report so that you can review it. We understand that plagiarism is academic suicide. We would not take the risk of submitting plagiarized work and jeopardize your academic journey. Furthermore, we do not sell or use prewritten papers, and each paper is written from scratch.

When will I get my paper?

You determine when you get the paper by setting the deadline when placing the order. All papers are delivered within the deadline. We are well aware that we operate in a time-sensitive industry. As such, we have laid out strategies to ensure that the client receives the paper on time and they never miss the deadline. We understand that papers that are submitted late have some points deducted. We do not want you to miss any points due to late submission. We work on beating deadlines by huge margins in order to ensure that you have ample time to review the paper before you submit it.

Will anyone find out that I used your services?

We have a privacy and confidentiality policy that guides our work. We NEVER share any customer information with third parties. Noone will ever know that you used our assignment help services. It’s only between you and us. We are bound by our policies to protect the customer’s identity and information. All your information, such as your names, phone number, email, order information, and so on, are protected. We have robust security systems that ensure that your data is protected. Hacking our systems is close to impossible, and it has never happened.

How our Assignment  Help Service Works

1.      Place an order

You fill all the paper instructions in the order form. Make sure you include all the helpful materials so that our academic writers can deliver the perfect paper. It will also help to eliminate unnecessary revisions.

2.      Pay for the order

Proceed to pay for the paper so that it can be assigned to one of our expert academic writers. The paper subject is matched with the writer’s area of specialization.

3.      Track the progress

You communicate with the writer and know about the progress of the paper. The client can ask the writer for drafts of the paper. The client can upload extra material and include additional instructions from the lecturer. Receive a paper.

4.      Download the paper

The paper is sent to your email and uploaded to your personal account. You also get a plagiarism report attached to your paper.

smile and order essaysmile and order essay PLACE THIS ORDER OR A SIMILAR ORDER WITH US TODAY AND GET A PERFECT SCORE!!!

order custom essay paper